Guides, FAQs, checklists and planning help across every service
Use the hub to find practical resources by service, resource type, topic and audience. The goal is simple: make it easier for visitors to understand what they need, what happens next and which EnviroSolution service solves the issue.
Browse by service
Latest resources
When a Coal Mining Risk Assessment Is Needed for Planning
When a CMRA is typically required and why it matters even where mining activity feels historic or distant.
Open resourceWhy SuDS Strategy Can Become a Planning Bottleneck
Why drainage and SuDS details can delay planning and how to approach them more strategically.
Open resourceHow Drainage and Flood Constraints Affect Small Developments
Why even smaller schemes can run into drainage and flood constraints and why they should be reviewed early.
Open resourceDo I Need a Flood Risk Assessment for My Planning Application?
When a Flood Risk Assessment is typically needed and why planning teams benefit from addressing it early.
Open resourceCommon Asbestos Questions Property Owners Ask Before Renovation
The practical questions property owners often ask when planning renovation works in older buildings.
Open resourceRefurbishment and Demolition Surveys: Why They Matter
Why refurbishment and demolition asbestos surveys are a critical pre-start requirement on many building projects.
Open resourceWhen an Asbestos Survey Is Usually Needed Before Work Starts
A clear guide to when asbestos surveys are typically needed before refurbishment, demolition or site works begin.
Open resourceWhy a Good Desktop Study Helps Prevent Planning Delays
Why an early, well-structured Phase 1 Desktop Study can save time during planning rather than becoming an afterthought.
Open resourceWhat Happens After a Phase 1 Report Flags Potential Risk?
A practical explanation of the next steps after a Phase 1 report identifies possible ground risk on a development site.
Open resourceDo I Need a Phase 1 Desktop Study for Planning?
When a Phase 1 Desktop Study is usually required, what it covers and why it often sits at the start of the planning process.
Open resourceWhat Developers Should Know About Brownfield Ground Risk
A straightforward look at why brownfield ground risk needs early attention and how it affects programme, cost and planning.
Open resourceWhen a Phase 1 Desk Study Recommends Phase 2 Investigation
What it means when a Phase 1 report recommends intrusive investigation and how to move quickly without over-scoping the work.
Open resource