• No products in the cart.

Flood Risk & Drainage: Practical Steps UK Sites Can Take Before the Next Downpour

UK weather keeps reminding us that flood risk isn’t abstract — it’s operational. From blocked gullies to undersized attenuation tanks, drainage is often the weakest link that puts projects, stock and reputations at risk. If you manage commercial property, develop housing, or operate industrial yards, now is the time to stress‑test your site against cloudbursts and rising groundwater.

At EnviroSolution, our team delivers practical Flood Risk and Drainage reviews that look beyond the report to the “so what?” We assess surface water pathways, local topography, outfalls and capacity, then translate the findings into an easy action plan you can sequence with contractors. When needed, we pair this with Phase 1 Desktop Study for planning submissions and evidence, and with infiltration testing to understand how your ground really behaves — not just what a drawing says.

Why it matters this year: insurance excesses are rising, supply chains are tighter, and regulators expect robust reasoning rather than boilerplate text. We help you evidence decisions, size interventions proportionately and demonstrate value for money to boards and funders. Typical outcomes range from small tweaks (re‑grading, additional gullies, maintenance plans) through to engineered SuDS and resilience measures staged over time.

Want a fast, clear view of risk and options? Start with a sanity check using our EnviroSolution services — then book a scoped Flood & Drainage review tailored to your site and programme. We’ll keep the paperwork lean, the recommendations realistic and the timelines aligned with your build or maintenance windows.