Skip to content

News

EnviroSolution news and guidance

Planning, development and environmental consultancy updates.

Read practical EnviroSolution articles covering planning conditions, contaminated land, coal mining risk, drainage, asbestos, ecology, energy assessment and other technical topics affecting UK development projects.

Breaking Planning Gridlock: How to Submit Environmental Evidence that Passes First Time 17 September 2025Phase 1 Desktop Study, Infiltration Testing

Breaking Planning Gridlock: How to Submit Environmental Evidence that Passes First Time

Why ‘complete on day one’ is the new standard As reforms push the system to decide faster, poorly evidenced applications fall to the bottom of the pile. Case […]

Read article
Hedgehog Highways & Wildlife‑Safe Design: What Lords’ Amendments Mean for Schemes 17 September 2025Phase 1 Desktop Study

Hedgehog Highways & Wildlife‑Safe Design: What Lords’ Amendments Mean for Schemes

From ‘nice to have’ to normal practice Wildlife‑friendly design is moving from marketing copy into mainstream planning requirements. Lords’ amendments and local policy shifts are pushing for tangible […]

Read article
National Parks Sewage Crisis: Designing SuDS that Protect Tourist Hotspots 17 September 2025Infiltration Testing, Phase 1 Desktop Study

National Parks Sewage Crisis: Designing SuDS that Protect Tourist Hotspots

Why parks are under pressure Popular UK national parks are dealing with prolonged sewage discharges during peak seasons. Visitor surges strain ageing networks, and in many valleys combined […]

Read article
Ground Stability in Industrial Land Regeneration: Don’t Let History Derail Design 12 September 2025Coal Mining Risk Assessment, Phase 1 Desktop Study

Ground Stability in Industrial Land Regeneration: Don’t Let History Derail Design

Old ground, new risks Industrial land carries long memories—made ground, shallow voids, undocumented services and historic foundations. If ignored, those memories resurface as differential settlement, broken drainage and […]

Read article
From Plant to Plots: Converting Decommissioned Sites into Housing 12 September 2025SAPs, Asbestos

From Plant to Plots: Converting Decommissioned Sites into Housing

Sequence the change of use Decommissioned sites can become high‑quality housing, but only with careful sequencing from the very first sketch. Start with feasibility: what can be retained, […]

Read article
Ecology and Biodiversity on Decommissioned Sites: From Liability to Legacy 12 September 2025Phase 1 Desktop Study

Ecology and Biodiversity on Decommissioned Sites: From Liability to Legacy

Nature rarely takes a break When operations stop, nature moves in—ruderal plant communities, nesting birds, opportunistic mammals. Left unmanaged, this can complicate demolition and spark objections to redevelopment. […]

Read article
Meeting Planning Obligations During Site Closure and Handover 12 September 2025Phase 1 Desktop Study, SAPs

Meeting Planning Obligations During Site Closure and Handover

Compliance doesn’t end at shuttering Section 106 commitments, planning conditions and management plans remain live as sites wind down. Dust, noise, water quality and traffic controls still apply; […]

Read article
Closing Retail Parks: Drainage, Infiltration and the Path to Repurpose 12 September 2025Infiltration Testing, Phase 1 Desktop Study

Closing Retail Parks: Drainage, Infiltration and the Path to Repurpose

Hardstandings hide drainage surprises Retail parks and big‑box stores often sit on expansive hardstandings with complex legacy drainage. When occupiers leave and repurposing begins—trade counters, mixed‑use, last‑mile logistics—surface‑water […]

Read article
Decommissioning Fuel Stations: Managing Hydrocarbon Risk the Smart Way 12 September 2025Phase 1 Desktop Study, Waste Classification

Decommissioning Fuel Stations: Managing Hydrocarbon Risk the Smart Way

Tanks out, risks controlled Petrol filling stations are compact but complex. Underground storage tanks (USTs), interceptors, vent lines and forecourt slabs create multiple pathways for hydrocarbon migration. A […]

Read article
From Closure to Construction: Brownfield Redevelopment After Decommissioning 12 September 2025Phase 1 Desktop Study, Coal Mining Risk Assessment

From Closure to Construction: Brownfield Redevelopment After Decommissioning

Redevelopment starts before the last skip leaves Decommissioning is only the first act. If the goal is redevelopment, the groundwork for planning should begin while demolition is still […]

Read article
WAC Testing: The Key to Cost-Controlled Demolition and Disposal 12 September 2025Waste Classification

WAC Testing: The Key to Cost-Controlled Demolition and Disposal

Why classification comes before excavation Every waste movement during decommissioning must be underpinned by a defensible classification. Without it, lorries are turned away, storage yards overflow and programmes […]

Read article
Asbestos Risks When Shutting Down Older Industrial and Commercial Buildings 12 September 2025Asbestos, Phase 1 Desktop Study

Asbestos Risks When Shutting Down Older Industrial and Commercial Buildings

Closure doesn’t cancel duty of care When a facility closes, the duty to manage asbestos does not disappear—if anything, risk increases as services are isolated and invasive works […]

Read article
Browse the full news archive