Built around planning, development and compliance decisions.
Use this page to understand when the service is usually needed, what evidence is reviewed and what information helps us quote accurately.
- Planning and regulator context
- Clear deliverables and next steps
- Linked services considered early
The most efficient SAP work starts while the specification can still be adjusted. Fabric, glazing, thermal bridging, heating, ventilation and renewable systems all interact, so late changes can affect compliance.
When this service is used
Used for building regulations, new-build residential schemes, conversions and design-stage energy performance compliance.
What the report normally includes
- Design-stage SAP assessment
- Part L compliance review
- Fabric and services input review
- Recommendations where compliance is not achieved
- Final-stage support where required
What we need from you
Providing the right information at the start helps us confirm the scope, quote accurately and avoid back-and-forth once the work is underway.
- Architectural plans and elevations
- Construction specification
- Heating and ventilation details
- Window and door schedules
- Number of plots or dwellings
Useful to know before you enquire
Common questions
When should SAP calculations start?
Ideally during design, once sufficient drawings and specification information are available but before key fabric and services choices are fixed.
Can you help if the design fails SAP?
Yes. We can identify the inputs driving the result and discuss practical specification changes for the design team to consider.
Do SAP calculations and EPCs use the same information?
They are linked on new dwellings, but the project still needs the correct assessment route and final as-built information before certification.
Related services
These services are often reviewed alongside SAP Calculations depending on the site, planning context and proposed development.
Send the right information first time.
Our custom enquiry builder asks service-specific questions so we can confirm the correct scope, identify linked services and avoid unnecessary delays.
Build one enquiry for this and any related services.
Submit site information, planning references and supporting documents once. We’ll review the scope and confirm what is required.


