Skip to content
Knowledge Hub

What Clients Usually Need to Prepare for Air Quality

What to send before Air Quality: the site, planning, design and project information that helps EnviroSolution confirm the right scope first time.

Quick answer

Air Quality can usually be scoped faster when the project team sends the core site, planning and design information at the outset. The useful inputs are specific to this service, so the checklist below focuses on the evidence that affects the technical scope rather than a generic document list.

Advice

Use this guidance to check what may be needed before you submit information.

If the wording on your planning condition, tender request or site constraint is unclear, send it to EnviroSolution and we can advise which report, survey or assessment is likely to be relevant.

Guidance

Information to send for Air Quality

  • Site address and proposed use
  • Planning reference if available
  • Transport or traffic information if available
  • Site layout and access information
  • Any local authority comments received
Guidance

Project details that can change the scope

Used where traffic, dust, combustion emissions or sensitive receptors may affect planning acceptability, construction controls or operational compliance.

Tell us what decision the work needs to support, the submission or construction deadline, and whether another consultant, authority or regulator has already specified an output. That lets the scope respond to the actual project requirement instead of producing unnecessary work.

Guidance

What we can confirm from that information

Once the available information has been reviewed, the commission can be aligned with the outputs the wider team needs. Depending on the agreed scope this commonly includes:

  • Planning and receptor context review
  • Assessment scope based on development type
  • Air quality constraints and mitigation commentary
  • Dust or emissions considerations where relevant
  • Planning-ready conclusions and recommendations
Guidance

Before you submit the enquiry

Use current drawings where possible and include the exact wording of any planning condition, validation request, tender clause or regulator comment. If information is missing, identify that clearly rather than delaying the enquiry: we can confirm whether it is essential before the work starts.

View the Air Quality service or send the project details for scope review.

Need project support?

Send the site details and we’ll help identify the right next step.

Include the planning wording, site address, deadline and any supporting drawings or previous reports.