What Clients Usually Need to Prepare for Contaminated Land

What to send before Contaminated Land: the site, planning, design and project information that helps EnviroSolution confirm the right scope first time.

Quick answer

Contaminated Land can usually be scoped faster when the project team sends the core site, planning and design information at the outset. The useful inputs are specific to this service, so the checklist below focuses on the evidence that affects the technical scope rather than a generic document list.

Advice

Use this guidance to check what may be needed before you submit information.

If the wording on your planning condition, tender request or site constraint is unclear, send it to EnviroSolution and we can advise which report, survey or assessment is likely to be relevant.

Guidance

Information to send for Contaminated Land

  • Site address and boundary
  • Development proposals
  • Previous reports if available
  • Planning condition wording
  • Groundworks or disposal plans
Guidance

Project details that can change the scope

Used for brownfield development, planning conditions, due diligence, remediation design and validation where historical or current contamination may affect land use.

Tell us what decision the work needs to support, the submission or construction deadline, and whether another consultant, authority or regulator has already specified an output. That lets the scope respond to the actual project requirement instead of producing unnecessary work.

Guidance

What we can confirm from that information

Once the available information has been reviewed, the commission can be aligned with the outputs the wider team needs. Depending on the agreed scope this commonly includes:

  • Contaminated land risk review
  • Phase 1/Phase 2/remediation pathway advice
  • Soil, gas and groundwater consideration where relevant
  • Remediation and validation scope where needed
  • Planning and regulator-ready recommendations
Guidance

Before you submit the enquiry

Use current drawings where possible and include the exact wording of any planning condition, validation request, tender clause or regulator comment. If information is missing, identify that clearly rather than delaying the enquiry: we can confirm whether it is essential before the work starts.

View the Contaminated Land service or send the project details for scope review.

Need project support?

Send the site details and we’ll help identify the right next step.

Include the planning wording, site address, deadline and any supporting drawings or previous reports.