Waste Classification can usually be scoped faster when the project team sends the core site, planning and design information at the outset. The useful inputs are specific to this service, so the checklist below focuses on the evidence that affects the technical scope rather than a generic document list.
Use this guidance to check what may be needed before you submit information.
If the wording on your planning condition, tender request or site constraint is unclear, send it to EnviroSolution and we can advise which report, survey or assessment is likely to be relevant.
Information to send for Waste Classification
- Material type, source and estimated volume
- Existing laboratory results where available
- Site address and source area or stockpile information
- Relevant photographs or plans
- Proposed treatment, reuse or disposal route if known
Project details that can change the scope
Used before off-site disposal, remediation, excavation or material management where the waste producer needs a defensible classification under the applicable waste classification framework.
Tell us what decision the work needs to support, the submission or construction deadline, and whether another consultant, authority or regulator has already specified an output. That lets the scope respond to the actual project requirement instead of producing unnecessary work.
What we can confirm from that information
Once the available information has been reviewed, the commission can be aligned with the outputs the wider team needs. Depending on the agreed scope this commonly includes:
- Review of material source, site history and available laboratory data
- List of Waste coding and mirror-entry assessment where applicable
- Hazardous/non-hazardous waste classification
- Clear documentation to support waste management and disposal decisions
- Recommendation for separate WAC testing where the proposed receiving route requires it
Before you submit the enquiry
Use current drawings where possible and include the exact wording of any planning condition, validation request, tender clause or regulator comment. If information is missing, identify that clearly rather than delaying the enquiry: we can confirm whether it is essential before the work starts.
View the Waste Classification service or send the project details for scope review.