Thinking about budgeting for your next development? Don’t forget to include a Coal Mining Risk Assessment. It’s a small cost compared to the huge risks it helps you avoid. 💡
At EnviroSolution, prices for our CMRA services start from just a few hundred pounds, depending on:
- The location and size of the site 📍
- The complexity of the mining history ⛏️
- Whether a basic or enhanced report is needed 📑
What’s included?
✅ Detailed Coal Authority data review
✅ Site-specific risk analysis
✅ Professional recommendations
✅ Fast delivery (we know time is money!) 🕒
We pride ourselves on clear pricing, no hidden extras, and expert service that gets you results. The truth is, skipping a Coal Mining Risk Assessment could cost you tens of thousands in structural repairs or planning delays. 😱
Invest smart — protect your site and your wallet. Contact EnviroSolution for a fast, affordable Coal Mining Risk Assessment and get one step closer to a successful build. 🏡📈
What actually changes the cost of a CMRA?
A Coal Mining Risk Assessment is not priced purely by postcode. The fee reflects the amount of evidence that has to be reviewed and the complexity of the mining risk that must be interpreted for the proposed development.
- Site size and layout: larger or multi-plot sites can involve more potential interactions between development and recorded mining features.
- Mining complexity: mine entries, shallow workings, outcrops or incomplete records can require a more detailed review than a straightforward site.
- Available information: an existing consultants’ mining report, planning correspondence and a clear red-line plan can reduce avoidable information gathering.
- Development type: the assessment has to consider the actual proposal because foundations, ground disturbance and public-safety implications vary.
- Further investigation: if the desk-based CMRA identifies a risk that cannot be resolved from records alone, intrusive investigation is a separate stage and should be targeted to the specific feature.
A CMRA fee is different from the cost of resolving a mining hazard
The assessment identifies and interprets the risk. It does not automatically include drilling, mine-entry location, grouting, foundation design or other remedial works. Keeping those stages separate is useful because many sites can be resolved at desktop stage, while others need additional evidence before a safe and stable development strategy can be confirmed.
What to send for an accurate quote
Send the site address, red-line boundary, proposed layout, planning reference or condition wording and any mining search already obtained. That allows us to quote the Coal Mining Risk Assessment against the actual planning requirement rather than using a generic allowance.
If the concern is specifically a known or suspected mine shaft, see our guide to building near an old mine shaft.


