Real project examples from EnviroSolution’s environmental consultancy work.
Review selected EnviroSolution projects to understand typical challenges, services used, technical scope and outcomes before starting your own enquiry.
Choose the closest project type and open the full case study.
Each card links to a dedicated case study page with project background, technical context, linked services and clearer outcome information.

Ysgol St Christophers Geo-Environmental Site Investigation
Desk-based contamination review and Phase 2 intrusive investigation supporting a new school building and foundation-options appraisal in Wrexham.
Phase 1 Desktop Study; Phase 2 Ground Investigation; Infiltration Testing; GeotechnicalRead case study
Unilever Port Sunlight COMAH Environmental Risk Assessment
CDOIF environmental risk assessment supporting the five-yearly update of Unilever's COMAH Safety Report at Port Sunlight.
COMAH MATTE Assessments; Environmental Risk AssessmentRead case study
Noise Assessment for Sandway Homes at Browns Lane
24-hour noise monitoring and desk-based assessment for a proposed residential development on the former Bootle High School site.
Acoustics; Noise AssessmentRead case study
Stratford Padel Club Planning Condition Discharge
Phase 1 Desktop Study completed within six days for a padel-club expansion, using previous site-investigation evidence to avoid unnecessary intrusive work.
Phase 1 Desktop Study; Contaminated LandRead case study
Urgent Padel Court Planning Condition Discharge
Fast-track multidisciplinary planning-condition work for new hotel padel courts in North West England.
Mineral Resource Assessment; SUDS, Drainage & Flood; Ecology; GeotechnicalRead case study
M65 Rock Face Stability Assessment
Geological and engineering assessment of a rock face beside the M65 between junctions 7 and 8, including five consecutive nights of field data collection.
Geotechnical; Slope Stability Assessment; Desk StudyRead case study
Rapid Contamination Investigation for United Utilities
Rapid-response intrusive investigation in Barrow-in-Furness to assess potential contamination on previously infilled land.
Phase 2 Ground Investigation; Contaminated Land; Soil SamplingRead case study
Corby Power Station Contamination Assessment
Intrusive ground investigation along a former above-ground diesel pipeline route to assess the contamination status of Tata Steel land before infrastructure removal.
Phase 2 Ground Investigation; Contaminated Land; Laboratory AnalysisRead case study
Geo-Environmental Site Appraisal Services
Brownfield site appraisal surveys for a future school development in Manchester, supporting feasibility-stage decisions.
Site appraisal surveys; Phase 1 review; brownfield risk screeningRead case study
Geo-Environmental Site Investigation
Combined geo-environmental and geotechnical site investigation for a manufacturing facility extension.
Phase 2 geo-environmental site investigation; geotechnical assessment; gas and groundwater monitoring; waste classificationRead case study
Environmental Due Diligence Surveys
Environmental due diligence surveys across brownfield sites to support pre-acquisition risk decisions.
Environmental due diligence; Phase 1 desk studies; Phase 2 intrusive investigations; UXO survey coordinationRead case study
Asbestos Survey at a Hospital
Asbestos survey support for a former hospital building with a complex healthcare history.
Asbestos survey; refurbishment due diligence; building-risk reviewRead case studySend the site details and we’ll help identify the right service route.
Include the site address, planning reference, condition wording or tender information and the team will advise on suitable reports, surveys or assessments.


